References

The beginnings of our team go back in the past when people were already involved in same or similar projects and fields of working.

Our team of people has vast experiences in the branch building turnkey or partial solutions.

With this knowledge, we can provide the best services in the field of Engineering, Installation and Maintenance.

Some of the projects, where our team was involved are:

 

Vodafone Hungary (2018-2019)

Year of execution: 2018-2019

Area: UPS

Equipment used:

  • 1pcs Liebert APM (120kW)

Short project description:

Delivery, installation, and start-up of modular UPS device Liebert APM (120kW) together with the installation of batteries with back –up time up to 15min.

 

Governmental Institution (2018-2019)

Year of execution: 2018-2019

Area: UPS

Equipment used:

  • 2pcs Liebert EXL (400kW)
  • 4pcs Liebert EXL (200kW)
  • 2pcs Liebert EXL (100kW)
  • 1pcs Liebert NXC (30kW)

Short project description:

Delivery, installation, and start-up of all UPS devices together with the installation of batteries with back –up time up to 30min.

Total installed power is more than 1,8 MW.

 

Graphisoft Park Budapest (2018) 

Year of execution: 2018

Area: Cooling

Equipment used: 3 pcs VERTIV Liebert CRV21RA+HCR 33

Short project description:

We have provided DX cooling system for the server room. We have installed Liebert In the Row CRAC air-cooled,  DX units fitted with a scroll compressor.

The required range of  temperature/humidity in the room is:

  • The internal temperature: + 37 ± 1,0ºC
  • Relative humidity: 24% RH ± 5%

Total built-in net sensible cooling capacity is 60 kW.

 

Szamhead Kft (2015, 2016, 2018)

Year of execution: 2015, 2016, 2018

Area: UPS

Equipment used: 3pcs Liebert APM (150kW)

Short project description:

Delivery, installation and start-up of modular UPS devices Liebert APM (3pcs) with 150kW of total power each and with batteries for 10min autonomy. Our company is in charge of regular maintenance and readiness service of these devices.

Total installed power is 450kW or 0,45MW.

 

TEVA (2018)

Year of execution: 2018

Area: UPS

Equipment used: 1pcs Liebert NXC (60kW)

Short project description:

Delivery, installation and start-up of UPS device together with the installation of batteries with back –up time up to 10min.

Our company is also in charge of regular maintenance and readiness service on this location.

 

Big International Investment bank (2017-2018)

Year of execution: 2017-2018

Area: UPS

Equipment used:

  • 2pcs Liebert APM (120kW)
  • 2pcs Liebert NXC (15kW)
  • 2pcs Chloride Cross Rack (160A)

Short project description:

Delivery, installation, and start-up of modular UPS devices Liebert APM (2pcs) with 120kW of total power each and with batteries for 15min autonomy.  We have connected both devices to the system over STS switches.

Delivery, installation, and start-up of UPS devices Liebert NXC (2pcs) with 15kW of total power each and with batteries for 15min autonomy.

We also made a setup of LIFE services on all of the devices. Some of them are connected to LIFE over simple analog lines, some of them are using IP.

Our company is also in charge of regular maintenance and readiness service of these devices for the period of the next 5 years.

Total installed power is 270kW.

 

Nidec Sole Motor Bercel (2018)

Year of execution: 2018

Area: Cooling

Equipment used:

  • 2 pcs VERTIV Liebert PDX PX 031UA+HCR 43
  • 1 pcs VERTIV Liebert HPM S0FA+HCR 14

Short project description:

We have provided DX cooling system for the server room and hall. We have installed Liebert CRAC air-cooled,  DX units fitted with a scroll compressor.

The required range of  temperature/humidity in the room is:

  • The internal temperature: + 21 ± 1,0ºC
  • Relative humidity: 50% RH ± 5%

Total built-in net sensible cooling capacity is 56 kW.

 

TechMahindra (2016-2018)

Year of execution: 2016-2018

Area: UPS

Equipment used:

  • 1 pcs Liebert APM (30+30kW)
  • 3pcs Liebert APS (10kW (2pcs), 20kW)

Short project description:

Delivery, installation, and start-up of modular UPS devices Liebert APM (1pcs) with 30+30kW and Liebert APS (3pcs). All the devices have installed batteries with back-up time up to 60min.

Our company is also in charge of regular maintenance and readiness service of these devices.

 

MILL Park Budapest (2018)

Year of execution: 2018

Area: Cooling

Equipment used:  2 pcs VERTIV Liebert PDX PX 054DA+HBR 88

Short project description:

We have provided DX cooling system for the server room. We have installed Liebert CRAC air-cooled,  DX units fitted with a scroll compressor.

The required range of  temperature/humidity in the room is:

  • The internal temperature: + 26 ± 1,0ºC
  • Relative humidity: 40% RH ± 5%

Total built-in net sensible cooling capacity is 100 kW.

 

CTBTO Server Budapest (2018)

Year of execution: 2018

Area: Cooling

Equipment used:

  • 1 pcs VERTIV Liebert PDX PX 031DD+HCR 51

Short project description:

We have provided DX cooling system for the server room. We have installed Liebert CRAC air-cooled,  DX unit fitted with a scroll compressor.

The required range of  temperature/humidity in the room is:

  • The internal temperature: + 24 ± 1,0ºC
  • Relative humidity: 50% RH ± 5%

Total built-in net sensible cooling capacity is 21 kW.

 

Courthouse Hódmezővásárhely (2017)

Year of execution: 2017

Area: Cooling

Equipment used:

  • 1 pcs Liebert HPM S0HUA+HCR 17

Short project description:

We have provided DX cooling system for the server room. We have installed Liebert CRAC air-cooled,  DX unit fitted with a scroll compressor.

The required range of  temperature/humidity in the room is::

  • The internal temperature: + 24 ± 1,0ºC
  • Relative humidity: 50% RH ± 5%

Total built-in net sensible cooling capacity is 10kW.

 

Football Stadium Székesfehérvár (2017)

Year of execution: 2017

Area: Cooling

Equipment used:

  • 2 pcs Liebert PDX PX 33 DA+HCR 43

Short project description:

We have provided DX cooling system for the server room. We have installed 3 pieces Liebert CRAC air-cooled,  DX units fitted with a scroll compressor.

The required range of  temperature/humidity in the room is::

  • The internal temperature: + 24 ± 1,0ºC
  • Relative humidity: 50% RH ± 5%

Total built-in net sensible cooling capacity is 60 kW.

 

HIPO Budapest (2017)

Year of execution: 2017

Area: Cooling

Equipment used:

  • 3 pcs Liebert HPM S1GDA+HCR 33

Short project description:

We have provided DX cooling system for server room.  We have installed 3 pieces Liebert CRAC air-cooled,  DX units fitted with a scroll compressor.

The required range of  temperature/humidity in the room is:

  • The internal temperature: + 24 ± 1,0ºC
  • Relative humidity: 50% RH ± 5%

Total built-in net sensible cooling capacity is 47 kW.

 

METRO Stores (2016-2018)

Year of execution: 2016-2018

Area: Cooling

Equipment used:

  • Server room: 6 pcs Liebert HPM S1GUA+HCR 24, 

Short project description:

We have provided DX cooling system for the server room.  We have installed 5 pieces Liebert CRAC air-cooled,  DX units fitted with a scroll compressor.

The required range of  temperature/humidity in the rooms is:

  • The internal temperature: + 24 ± 1,0ºC
  • Relative humidity: 50% RH ± 5%

Total built-in net sensible cooling capacity is 110 kW.

 

APOLLO Tyres Hungary Gyöngyös (2016-2017)

Year of execution: 2016-2017

Area: Cooling

Equipment used:

  • MRS building: 4 pcs Liebert HPW WM15MD
  • PRS building: 4 pcs Liebert HPW WM15MD

 Short project description:

We have provided a cooling system for two individual Switch rooms in two buildings with a total of 8 pieces DX compact precision Liebert HPW Outdoor Package Cooling units.

The required range of  temperature/humidity in the rooms was:

  • The internal temperature: + 24 ± 1,0ºC
  • Relative humidity: 50% RH ± 5%

Total built-in net sensible cooling capacity is 120 kW.

 

National Instruments (Debrecen) Calibration Rooms (2016)

Year of execution: 2016

Area: Cooling

Equipment used:

  • Liebert PDX PX021 + HCR 43 (4pcs)

Short project description:

Two calibration laboratories used for calibration of sensors, instruments were provided with cooling system in 2N redundancy.

The required range of  temperature/humidity in this calibration rooms are:

  • The internal temperature : + 23°C ± 1,0ºC
  • Relative humidity : 45% RH ± 5%

The required range must be provided in six different measurement points in the room at the same time.

 

Big International Investment bank (Budapest, 2016)

Year of execution: 2016

Area: UPS

Equipment used:

  • 2pcs Liebert APM (120kW)

Short project description:

Delivery, installation and start-up of modular UPS devices Liebert APM (2pcs) with 120kW of total power each and with batteries for 15min authonomy. We also made a setup of LIFE services for both devices.

Our company is in charge for regular maintenance and readiness service of this devices for the period of next 5 years.

 

Hamburger Hungaria (Dunaújváros) Small Power Plant (2015)

Year of execution: 2015

Area: UPS

Equipment used:

  • Central building: 2pcs Liebert PCW PH025HC
  • Electrical building: 4pcs Liebert PCW PH025HC, 4pcs Liebert PCW PH080HC
  • Turbine hall: 1pc Liebert PCW PH100HC

Short project desription:

We have provided cooling system for six individual rooms in three buildings with a total of 11 pieces of chilled water precision Liebert CRAC units.

The required range of  temperature/humidity in the rooms were:

  • The internal temperature: + 24 ± 1,0ºC
  • Relative humidity: 50% RH ± 5%
  • Inlet fluid temperature: 10ºC
  • Outlet fluid temperature: 15ºC

Total built-in net sensible cooling capacity is 410 kW.

 

Company dealing with mutual funds

Construction of a Highly Secure Room with 35m2 net space with complete support infrastructure in the following configuration: Uninterruptible Power Supply System (UPS) 60kW, Air Conditioning (2x35kW), Electrical installations with Switching blocks, Server and Communication Racks, Fire Extinguishing System with NOVEC1230 gas, Intelligent PDU’s, Designing.

image_r

 

Electrical institute

Super computer data center for hydrodynamic calculation. Scope of supply was: 1 x NXa 160, 1 x NXa 40, 6 x Cool therm 30kW, 1 x HPM 80kW, 1 x 250kW Chiller

image2_r

 

Pharmaceutical company

Construction of a Highly Secure Room with 30m2 net space with complete support infrastructure in the following configuration: Uninterruptible Power Supply System (UPS) 60kW, Air Conditioning (2x35kW), Electrical installations with Switching blocks, Server and Communication Racks, Fire Extinguishing System with NOVEC1230 gas, Intelligent PDU’s, Central Surveillance System, Designing.

image3_r